Beat Lead Times

Skip the long lead times!

From Bench Instruments to Oscilloscopes, we are offering you the possibility to get the Test & Measurement equipment you need without waiting.


Looking for rental equipment?

Select sale items are available via rent to buy. Simply pay one month rental upfront prior to shipment, and thereafter monthly over 12 or 24 months.

The goods remain the property of SJ Electronics whilst being rented and the title only transfers to the customer when the final monthly payment i.e. the 12th or 24th payment is made. Acceptance of orders is at our discretion and is subject to satisfactory credit checks.

Contact us for more information >


All items are available for immediate dispatch

Stock is limited, so hurry to avoid disappointment! 

View as List Grid

Items 1-10 of 63

Set Descending Direction
  1. Keysight Smart Bench Essentials - EDU33211A 20 MHz, Single-Channel Function/Arbitrary Waveform Generator
    Keysight Smart Bench Essentials - EDU33211A 20 MHz, Single-Channel Function/Arbitrary Waveform Generator
    £740.00

    Keysight's EDU33211A single-channel function / arbitrary waveform generator offers premium performance for an affordable entry-level instrument. Enjoy basic functions and waveforms with exceptional stability and low distortion. Benefit from flexible features for efficient task completion. Featuring USB and LAN IO interfaces for remote connectivity, 20 MHz sine and square waveforms, ramp, triangle, noise, pulse generation, and more. Experience intuitive operation with a 7-inch color display and BenchVue Basic app for control.

Page
per page