Keithley 2600-TRIAX SMU Connector
Availability: In Stock / Short Lead Time
The Model 2600-TRIAX Connector assembly provides pathways from an SMU terminal block located on the Model 260x rear panel to three triax connectors.
The Model 2600-TRIAX Connector assembly provides pathways from an SMU terminal block located on the Model 260x rear panel to three triax connectors.