Keysight E3648A 100W Dual Output Power Supply Two 8V, 5A or 20V, 2.5A
The Keysight 100W, multiple-output E3648A is a clean, reliable power supply for general-purpose applications, and combine convenient benchtop capabilities with flexible system features in a compact, multi-output package.
For expert advice and pricing, get in touch at +44 (0) 800 583 4455 or sales@sjelectronics.co.uk
Key Features and Functions
Output ratings (@ 0°C to 40°C) 2 outputs
- Range 1: 0 to 8 V / 5 A
- Range 2: 0 to 20 V / 2.5 A
Programming accuracy (@ 25°C ±5°C), ±(% output + offset)
- Voltage: <0.05% + 10 mV (<0.1% + 25 mV for output 2 of E3646/47/48/49A)
- Current: <0.2% + 10 mA
Ripple & noise 20 Hz to 20 MHz
- Normal Mode Voltage: <5 mVpp / 0.5 mVrms
- Normal Mode Current: <4 mArms
Readback accuracy (@ 25°C ±5°C), ±(% output + offset)
- Voltage: <0.05% + 5 mV (<0.1% + 25 mV for output 2 of E3646/47/48/49A)
- Current: <0.15% + 5 mA (<0.15% + 10 mA for output 2 of E3646/47/48/49A)
Keysight basic DC power supplies offer essential features for a tight budget. The single & dual output, 30-100 W GPIB E3640 series provide small, compact size for bench and system use; low output ripple and noise; and built-in measurements and basic programmable features with GPIB and RS232 interface. The Keysight 100W, multiple-output E3648A is a clean, reliable power supply for general-purpose applications, and combine convenient benchtop capabilities with flexible system features in a compact, multi-output package.