Tektronix DPO4BND Oscilloscope Software (Bundle)
Availability:
In Stock / Short Lead Time
Special Price
£2,270.00
Regular Price
£4,540.00
Application Bundle modules for MDO/MSO/DPO4000B and MDO4000 Series Oscilloscopes
Tektronix DPO4BND Application Bundle Includes:
- DPO4AERO - Aerospace Serial Triggering and Analysis Module. Enables triggering on packet-level information on MIL-STD- 1553 buses as well as analytical tools such as digital views of the signal, bus views, packet decoding, search tools, and packet decode tables with time-stamp information.
- DPO4AUDIO - Audio Serial Triggering and Analysis Module. Enables triggering on packet-level information on I2S, LJ, RJ, and TDM audio buses as well as analytical tools such as digital views of the signal, bus views, packet decoding, search tools, and packet decode tables with time-stamp information.
- DPO4AUTO - Automotive Serial Triggering and Analysis Module. Enables triggering on packet-level information on CAN and LIN buses as well as analytical tools such as digital views of the signal, bus views, packet decoding, search tools, and packet decode tables with time-stamp information.
- DPO4COMP - Computer Serial Triggering and Analysis Module. Enables triggering on packet-level information on RS-232/422/485/UART buses as well as analytical tools such as digital views of the signal, bus views, packet decoding, search tools, and packet decode tables with time-stamp information.
- DPO4EMBD - Embedded Serial Triggering and Analysis Module. Enables triggering on packet-level information on I2C and SPI buses as well as analytical tools such as digital views of the signal, bus views, packet decoding, search tools, and packet decode tables with time-stamp information.
- DPO4ENET - Ethernet Serial Triggering and Analysis Module. Enables triggering on packet-level information on 10BASE-T and 100BASE-TX buses as wellas analytical tools such as digital views of the signal, bus views, packet decoding, search tools, and packetdecode tables with time-stamp information.
- DPO4LMT - Limit and Mask Testing Application Module. Enables testing against limit templates generated from “golden” waveforms and mask testing using custom masks.
- DPO4PWR - Power Analysis Application Module. Enables quick and accurate analysis of power quality, switching loss, harmonics, safeoperating area (SOA), modulation, ripple, and slew rate (dI/dt, dV/dt).
- DPO4USB - USB Serial Triggering and Analysis Module. Enables triggering on packet-level content for low-speed, and full-speed USB serialbuses. Also enables analytical tools such as digital views of the signal, bus views, packet decoding, search tools, and packet decode tables with time-stamp information for low-speed, full-speed, and high-speed USB serial buses.
- DPO4VID - HDTV and Custom (nonstandard) Video Triggering and Video Picture Module.