Tektronix MDO4054C-DEMO with Built in Spectrum Analyzer SA3 (Ex-Demonstration Product)
Available via rent to buy - £940.10 (12 months), £483.88 (24 months). Contact us for details
Ex-Demonstration Product - includes MDO4MSO/SA3 option
Tektronix MDO4054C-DEMO with Built in Spectrum Analyzer SA3
Available via rent to buy - £940.10 (12 months), £483.88 (24 months). Contact us for details
Ex-Demonstration Product - includes MDO4MSO/SA3 option
Introducing the New Tektronix MDO4000C 6-in-1 Versatility PLUS High Performance in One Powerful Oscilloscope
The new MDO4000C includes up to six built-in instruments, each with exceptional performance to address tough challenges. It features powerful triggering, search and analysis, and it’s the only scope to offer synchronized analog, digital and RF signal analysis - ideal for wireless communications in IoT and EMI troubleshooting.
For even more versatility, add the optional arbitrary/function generator to easily capture, edit and replay signals.
High Performance for Tough Challenges
20 Mpoint record length, flexible triggering and search, and 60.6 ps digital timing resolution help find elusive problems, fast.
Unique Built-in Spectrum Analyser
Easily measure delays between control signals and radio transmissions. See time-domain signals alongside EMI emissions.
Upgradeability
Add analog bandwidth, spectrum analyzer, function generator, digital channels, or protocol analysis as you need them - ensuring usefulness for years to come.