Tektronix TCP0030A Current Probe
Available via rent to buy - £281.14 (12 months), £144.70 (24 months). Contact us for details
TCP0030A is a high-performance, easy-to-use AC/DC current probe
Available via rent to buy - £281.14 (12 months), £144.70 (24 months). Contact us for details
Probe, AC/DC Current; 30 Amp DC, DC TO 120 MHZ; with TekVPI Interface; Certificate of Traceable Calibration Standard
The Tektronix TCP0030A is a high-performance, easy to use AC/DC Current Probe designed for use and direct connection (without the need of an additional power supply) to the TekVPI™ probe interface.
This AC/DC current measurement probe provides greater than 120MHz of bandwidth with selectable 5A and 30A measurement ranges. It also provides exceptional low-current measurement capability and accuracy to current levels as low as 1mA, important for meeting today's challenging current measurement needs.
What's in the Box?
- TCP0030A AC/DC Current Probe
- Instruction manual
- Probe Ground Lead, 6 inches length
- Nylon Carrying Case
Features:
- Easy to use and Accurate AC/DC Current Measurements
- Split-core Construction Allows Easy Circuit Connection
- DC to >120MHz bandwidth
- 30A RMS Maximum Current Capability
- 50A Peak Pulse Current Capability
- High Accuracy with Typically Less than 1% DC Gain Error
- Accurately Measures Current Levels as Low as 1mA
- Low Noise and DC Drift
- 3rd party safety certification
- Manufacturer's part: Tektronix TCP0030A
Applications:
- Power Supplies
- Semiconductor Devices
- Power Inverters/Converters
- Electronic Ballasts
- Industrial/Consumer Electronics
- Mobile Communications