Tektronix TBS2074B Digital Storage Oscilloscope
Available via rent to buy - £113.05 (12 months), £58.19 (24 months). Contact us for details
- 70 MHz bandwidth
- 2 GS/s sample rate
- 4-channel digital storage oscilloscope
- 5 Mpts record length
- 5 year warranty
Available via rent to buy - £113.05 (12 months), £58.19 (24 months). Contact us for details
Tektronix TBS2074B - 70 MHz, 2 GS/s, 5 Mpts record length, 4-channel digital storage oscilloscope.
The TBS2000B Series of Oscilloscopes with a 9-inch WVGA display, 5 million point record length and 2 GS/s sample rate, capture and display significantly more signal to help you debug and validate the designs faster. Easily and confidently analyze your signals with new on-waveform cursor readouts and 32 automated measurements, each with informative tips. The TekVPI® probe interface supports traditional passive BNC probes, but also enables wide application coverage with the latest active voltage probes and current probes.
Key performance specifications
- 2 and 4 analog channel models
- 200 MHz, 100 MHz, and 70 MHz bandwidth models up to 2 GS/s sampling rate
- 5 M record length on all channels
- 5 year warranty
Key features
- 9-inch WVGA color display
- 15 horizontal grids show 50% more signal
- TekVPI probe interface supports active, differential, and current probes with automatic scaling and units
- New front-end design enables more accurate measurements
- 32 automated measurements, and FFT function for thorough waveform analysis
- Search and Mark features for easy identification of events that occur in the acquired waveform
- HelpEverywhere provides helpful on-screen tips for new users
- Built-in Scope Intro handbook provides operating instructions and oscilloscope fundamentals
- The instrument user interface and the front panel overlay is translated into 10 languages
Connectivity
- USB 2.0 host port on the front panel for quick and easy data storage
- Wi-Fi interface provides wireless communications capability support
- USB 2.0 device port on rear panel for easy connection to a PC
- 10/100BASE-T Ethernet port for remote control over LAN
Designed to make your work easier
The TBS2000B Series is designed for easy operation and quick hands-on learning. Dedicated controls provide quick access to important settings, so you can evaluate signals faster. See more of your signal with the TBS2000B with 10 vertical divisions and 15 horizontal divisions.
- Courseware function presents lab exercise guidance on the display
- Fully compatible with TekSmartLab lab management software for education
- Autoset, Cursors and Automated measurements can be disabled to help educators to teach basic concepts to students
Application Notes: