Tektronix MDO34-3-BW-200-DEMO, 200 MHz Bandwidth 3 Series Mixed Domain Oscilloscope (Ex-Demonstration Product)
Available via rent to buy - £281.78 (12 months), £145.03 (24 months). Contact us for details
Ex-Demonstration Product
- Mixed Domain Oscilloscope with (4) analog channels, (1) spectrum analyzer input, and (1) logic analyzer
- Bandwdith: 200 MHz
- Sample Rate: Up to 5 GS/s
- 11.6 - inch HD (1920 x 1080) capacitive touchscreen
Available via rent to buy - £281.78 (12 months), £145.03 (24 months). Contact us for details
Ex-Demonstration Product
The biggest display in its class, and remarkable user interface
The Tektronix MDO34 from the NEW 3 Series has the same made-for-touch user interface technology as the award-winning 5 Series along with the largest display and highest resolution display in its class. The 3 Series MDO works how a scope should work.
-
11.6-inch HD display
-
Pinch, tap, swipe capacitive touchscreen
Compact, yet packed with capabilities
It’s only 6 inches(15 cm) deep but the 3 Series MDO is a lot of oscilloscope. It gives you the tools you need to validate and troubleshoot complex embedded systems.
-
Up to 5 GS/s sample rate on each analog channel
-
More than 125 trigger combinations
-
Dozens of automated measurements
-
Wide range of available serial bus decode and trigger options
-
Optional 16 digital logic channels
-
Optional integrated 1 GHz or 3 GHz spectrum analyzer
-
Optional 50 MHz arbitrary / function generator
Features:
Input Channels
-
4 analog
-
16 digital (optional)
-
1 spectrum analyzer (optional)
Bandwidth
-
100 MHz, 200 MHz, 350 MHz, 500 MHz, or 1 GHz (upgradable)
Sample Rate
-
5 GS/s (1 GHz model), 2.5 GS (all other models) on analog channels
-
Up to 8.25 GS/s (121 ps resolution) on digital channels
Record Length
-
10 Mpoints on all channels
Spectrum Analyzer
-
1 GHz or 3 GHz
Signal Generator
-
Arbitrary, Sine, Square, Pulse, Ramp, Triangle, DC Level, Gaussian, Lorentz, Exponential Rise/Fall, Sin(x)/x, Random Noise, Haversine, Cardiac
Digital Voltmeter (free with product registration)
-
4-digit AC RMS, DC, and AC+DC RMS voltage measurements
Trigger Frequency Counter *free with product registration)
-
5-digit frequency measurements
Advanced Analysis (optional)
-
Automated Power Measurements
Protocol Support (optional)
-
I2C, SPI
-
RS-232, RS-422, RS-485, UART
-
CAN, CAN FD, LIN, FlexRay
-
MIL-STD-1553, ARINC 429
-
I2S, LJ, RJ, TDM
-
USB 2.0
Display
-
11.6-inch (295 mm)
-
HD color (1920 x 1080) capacitive touchscreen
Weight
-
11.7 lbs (5.3 kg)
INCLUDES:
- Four low-capacitance (3.9 pF) 10X passive probes
- 100 MHz, 200 MHz models: TPP0250 250 MHz probes
- 350 MHz, 500 MHz, or 1 GHz models; TPP0500B 500 MHz probes
- Probe accessory kit
- Installation and safety manual in English
- Accessory bag
- Power cord
- Calibration certificate documenting traceability to National Metrology Institute(s) and ISO9001/ISO17025 quality system registration
- 3- year warranty covering all parts and labor on the instrument. 1-year warranty, p[arts and labor, on included probes
Applications
Embedded serial bus analysis, embedded design and IoT
The 3 Series MDO helps you overcome system level challenges with automatic trigger, decode, and search options for serial buses. Options are available individually or as a cost-effective bundle. Discover and solve issues quickly by performing system level debug on mixed signal embedded systems including today's most common serial bus technologies with the 3 Series MDO and support for a broad set of common serial buses.
Power measurements, analysis and power design
The 3 Series offers power test solutions to help get fast answers in today’s world of higher switching speeds and stricter noise limits.
Make reliable and repeatable voltage, current, and power measurements using automated power quality, switching loss, harmonics, ripple, modulation, and safe operating area measurements with the widest selection of power probes in an affordable solution.
Read this app note on Power Supply Measurement and Analysis with 3-PWR
Electromagnetic interference (EMI) troubleshooting
Not getting to the root cause of EMI failures can prevent you from shipping product. The 3 Series MDO with its built-in spectrum analyzer can help you sniff out sources of EMI fast.
Engineering education
Go beyond AC and DC theory to cover mixed signal designs with logic channels and built-in spectrum analyzer. Managing multiple instruments on a bench can be troublesome. The 3 Series MDO combines analog, digital, and RF measurements with a signal source in a single, small (5.9 in., 149 mm deep) instrument. The combination of a small instrument and high level of integration aids in the teaching of various electronics principles as well as in its usage for more sophisticated lab experiments. Full upgradeability enables adding functionality over time as needs change or budgets allow.
Manufacturing Test and Troubleshooting
Size and space constraints can play havoc on a manufacturing floor. The 3 Series MDO minimizes rack or bench space by integrating multiple instruments into one small package. Integration reduces cost associated with utilizing multiple different instrument types in manufacturing test or troubleshooting stations.
Service Installation and Maintenance
Having the right instruments when and where you need them is critical. The 3 Series MDO combines analog waveforms, digital logic, and spectrum analysis in a lightweight (11.7 lbs, 5.3 kg), portable package -making it the perfect choice where space is limited and flexibility is desired.