Skip the long lead times!
From Bench Instruments to Oscilloscopes, we are offering you the possibility to get the Test & Measurement equipment you need without waiting.
Looking for rental equipment?
Select sale items are available via rent to buy. Simply pay one month rental upfront prior to shipment, and thereafter monthly over 12 or 24 months.
The goods remain the property of SJ Electronics whilst being rented and the title only transfers to the customer when the final monthly payment i.e. the 12th or 24th payment is made. Acceptance of orders is at our discretion and is subject to satisfactory credit checks.
Contact us for more information >
All items are available for immediate dispatch
Stock is limited, so hurry to avoid disappointment!
- FLIR - Close-up IR Lens, 1.5X (25um) With Case (Ex-Demonstration Product)Special Price £5,179.00 Regular Price £7,399.00
Ex-Demonstration Product
Enhance your research and development projects with the FLIR 1.5x Close-up Infrared Lens (25 µm) with case. Perfect for examining PCBs and small electronic components, this lens is designed for use with scientific cameras, including the FLIR A615 and A655sc models. Elevate your exploration with precision and clarity.
For expert advice and pricing, get in touch at +44 (0) 800 583 4455 or sales@sjelectronics.co.uk
Learn More - Keithley 2110 5.5 Digit Dual-Display Digital Multimeter with USB InterfaceSpecial Price £431.20 Regular Price £616.00
Get more DMM for your money! This ruggedly constructed DMM combines a very low price with superior measurement accuracy, a comprehensive set of capabilities, and high speed for all portable, bench, and rackmount system applications only found in high-end System DMMs!
Learn More - Keithley 2231A-001 USB Adapter for Keithley 2231A Series DC Power SuppliesSpecial Price £42.00 Regular Price £75.00
The Model 2231A-001 USB Adapter allows you to communicate with Model 2231A-30-3 Triple-Channel DC Power Supply from a remote interface.
Learn More - Tektronix AFG3102-DEMO (Ex-Demonstration Product)Special Price £2,724.00 Regular Price £4,540.00
Available via rent to buy - £231.54 (12 months), £119.18 (24 months). Contact us for details
Ex-Demonstration Product
Tektronix Arbitrary Function Generator - 100 MHz - 2 Channels
Learn More - Keithley 7702-DEMO Multiplexer Module for use with DAQ6510 (Ex-Demonstration Product)
Ex-Demonstration Product
The 7702 40-Channel Differential Multiplexer Module offers 40 channels of 2-pole or 20 channels of 4-pole
Learn More
multiplexer switching that can be configured as two independent banks of multiplexers. - Keithley 7708-DEMO Multiplexer Module for use with DAQ6510 (Ex-Demonstration Product)
Ex-Demonstration Product
The Model 7708 40-Channel Differential Multiplexer Plug-In Module with Automatic CJC offers 40 channels of 2-pole or 20 channels of 4-pole multiplexer switching that can be configured as two independent banks of multiplexers.
Learn More - Tektronix TDS1001C-EDU Digital OscilloscopeSpecial Price £264.00 Regular Price £528.00
Tektronix Oscilloscope Digital Storage, 40MHz, 500MSa/s, 2-CH
Learn More - Tektronix TBS1202C Digital Storage OscilloscopeSpecial Price £980.00 Regular Price £1,400.00
- 200 MHz bandwidth
- 1 GS/s sample rate
- 2-channel digital storage oscilloscope
- Tektronix TBS2074B Digital Storage OscilloscopeSpecial Price £950.00 Regular Price £1,900.00
Available via rent to buy - £113.05 (12 months), £58.19 (24 months). Contact us for details
- 70 MHz bandwidth
- 2 GS/s sample rate
- 4-channel digital storage oscilloscope
- 5 Mpts record length
- 5 year warranty
- Tektronix MDO34-3-BW-200-DEMO, 200 MHz Bandwidth 3 Series Mixed Domain Oscilloscope (Ex-Demonstration Product)Special Price £3,094.00 Regular Price £4,420.00
Available via rent to buy - £281.78 (12 months), £145.03 (24 months). Contact us for details
Ex-Demonstration Product
- Mixed Domain Oscilloscope with (4) analog channels, (1) spectrum analyzer input, and (1) logic analyzer
- Bandwdith: 200 MHz
- Sample Rate: Up to 5 GS/s
- 11.6 - inch HD (1920 x 1080) capacitive touchscreen